Building Permit Application

From Noisebridge
Revision as of 11:48, 9 July 2019 by Nthmost (talk | contribs) (fixed Slack channel name)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Noisebridge has been notified to take corrective action, not limited to, within 30 days of 9-14-2017 filing for a building permit with plans.

See: #inspection for ongoing details.

Contact info for the inspector is available in image below.

NOTICE-instpectiongate.jpg