Summer-scrub
Tasks
Locker Purge: Lockers shall be opened and purged according to previously established protocols
Project Shelf purge: Abandoned projects (Tags >2 months old) will be untagged and moved to hack shelves or Ewaste staging depending on judgement of person preforming purge.
Dump Run Staging: All general and construction debris should be collected for later loading for transport to the dump.
Ewaste Staging: Gather current Ewaste and add additional Ewaste from hack shelves and project shelves. Collect into easy to move bins and bags for later transport to an Ewaste recycler.
Hazards Staging: Any hazardous materials that are no longer needed or of little use should be put into crates and stacked for removal to the proper facility.
Dust Shelves: Brush dust off any high surfaces and shelves for later collection via sweeping.
Wipe down Tables and Chairs: Clear tables and chairs and wipe/scrub down with clean wet rags.
Sweep/Mop: Move furniture and sweep and mop the space. This should come after wiping down the tables.
Entryway sweeping: Sweep out stairway and collect any accumulated trash. Also sweep elevator carriage.
Tool collection and reset: Carefully search the space for out of place tools, collect any misplaced tools, put them away
Sewing area purge: Remove any less useful scraps, and abandoned projects (Tags >2 months old). Add to Dump Run staging pile.
Shop purge: Remove less useful scrap materials, keeping only the better scraps that can fit in the shop scrap areas. Add to dump run staging pile.
Purge books: Books that are not to be part of the Noisebridge Library collection should be staged for Dump Run, or offered for free on Mission street.
Window Cleaning: Windows to be wiped clean and dryed. To the extent that the person perfuming the task feels safe doing so.
Bathroom Cleaning: Empty trash cans. Wipe down walls. Scrub fixtures. Sweep and Mop Floors.