Reboot24: Difference between revisions
(→Photos: add gallery -- uploaded more, will include in next edit) |
m (→Photos: added images to gallery -- uploaded others, will add to gallery on future edit) |
||
| Line 19: | Line 19: | ||
<gallery mode="nolines" widths="300" heights="200"> | <gallery mode="nolines" widths="300" heights="200"> | ||
File:PXL 20240403 160309432.MP.webp|Bike rack installed during [[Reboot24]], on the fence by the front gate | File:PXL 20240403 160309432.MP.webp|Bike rack installed during [[Reboot24]], on the fence by the front gate | ||
File:Yellow lane -- hackitorium to front.webp|Yellow paint road, hackitorium to front -- [[Accessibility]] and fire [[Safety]] | |||
File:Yellow lane -- hackitorium to back.webp|Yellow paint road, hackitorium to back -- [[Accessibility]] and fire [[Safety]] | |||
</gallery> | </gallery> | ||
[[File:Upstairs project shelf, empty reboot24.webp|none|thumb|Upstairs project shelf, empty [[Reboot24]]]] | |||
[[File:Books going, Reboot24.webp|none|thumb|Books leaving in boxes from [[Reboot24]]]] | |||
==Plan== | ==Plan== | ||
Revision as of 22:57, 8 May 2024
| Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Stuff | Events | Projects | Meetings | Donate | E |
| About | Vision | 272 Capp | Materials | Testimonials | Lore | Photos | Hackerspaces | 501c3 | Press | Press Kit | Zine | Help | E |
| Lore | Oral histories | History | Anarchy | 83c | 2169 | 272 Capp | Anniversaries | Rebase | Reboot | Humanitarian | Kitchen | Drama | V · T · E |
Noisebridge Reboots are a temporary closure of the space to support cleanup/infra upgrades would otherwise be unlikely to be done.
There is currently a the 2024 Reboot planned from March 30th - April 6th.
The space will be closed aside from cleanup and select ongoing meetups/classes.
Check out the discord channel, #reboot24, for details and ongoing discussions.
Achieved
We repainted the floors including fire exit paths, cleared library, cleaned and restructured the electronics room and library. We kept, and are keeping, a running task board, post-it notes, downstairs near the rollup garage door.
Photos
Bike rack installed during Reboot24, on the fence by the front gate
Yellow paint road, hackitorium to front -- Accessibility and fire Safety
Yellow paint road, hackitorium to back -- Accessibility and fire Safety