SpringClean2016: Difference between revisions
(Created page with "__NOTOC__ 420px") |
No edit summary |
||
| Line 1: | Line 1: | ||
__NOTOC__ | __NOTOC__ | ||
[[File:NBSpringClean2016.jpg|420px]] | [[File:NBSpringClean2016.jpg|420px]] | ||
==Tasks== | |||
Dump Run Staging: All general and construction debris should be collected for later loading for transport to the dump. | |||
Ewaste Staging: Gather current Ewaste and add additional Ewaste from hack shelves and project shelves. Collect into easy to move bins and bags for later transport to an Ewaste recycler. | |||
Hazards Staging: Any hazardous materials that are no longer needed or of little use should be put into crates and stacked for removal to the proper facility. | |||
Dust Shelves: Brush dust off any high surfaces and shelves for later collection via sweeping. | |||
Wipe down Tables and Chairs: Clear tables and chairs and wipe/scrub down with clean wet rags. | |||
Sweep/Mop: Move furniture and sweep and mop the space. This should come after wiping down the tables. | |||
Entryway sweeping: Sweep out stairway and collect any accumulated trash. Also sweep elevator carriage. | |||
Tool collection and reset: Phase 1. Carefully walk through each room in the space and collect any misplaced tools. Look though any bins / crates that are holding tools in out of the way locations, where they wouldn't be found. If the location of tools is not known, collect into a crate for later sorting. Phase 2. Look through tool bins / shelves in electronics area, shop, and sewing area and sort any tools that appear to be in the wrong places, or make better places for them. | |||
Sewing area purge: Remove any less useful scraps, and abandoned projects (Tags >2 months old). Add to Dump Run staging pile. | |||
Shop purge: Remove less useful scrap materials, keeping only the better scraps that can fit in the shop scrap areas. Add to dump run staging pile. | |||
Purge books: Books that are not to be part of the Noisebridge Library collection should be staged for Dump Run, or offered for free on Mission street. | |||
Locker Purge: Lockers shall be opened and purged according to previously established protocols | |||
Project Shelf purge: Abandoned projects (Tags >2 months old) will be untagged and moved to hack shelves or Ewaste staging depending on judgement of person preforming purge. | |||
Window Cleaning: Windows to be wiped clean and dryed. To the extent that the person perfuming the task feels safe doing so. | |||
Bathroom Cleaning: Empty trash cans. Wipe down walls. Scrub fixtures. Sweep and Mop Floors. | |||
Turing Paint Job: Scrub off paint splatters on windows/doors. Mask off equipment. Touch up Ceiling art (See Jarrod for details). Mask and paint walls. | |||
Project Shelf and Hack Shelf relocation: After/During Hack and Project shelf purge. Rebuild shelving in new location for project storage and move hack shelf items to current project shelf location. | |||
==Supplies required or desired== | |||
Need a faucet to hose adapter for filling mop buckets. | |||
Revision as of 17:55, 25 April 2016
Tasks
Dump Run Staging: All general and construction debris should be collected for later loading for transport to the dump.
Ewaste Staging: Gather current Ewaste and add additional Ewaste from hack shelves and project shelves. Collect into easy to move bins and bags for later transport to an Ewaste recycler.
Hazards Staging: Any hazardous materials that are no longer needed or of little use should be put into crates and stacked for removal to the proper facility.
Dust Shelves: Brush dust off any high surfaces and shelves for later collection via sweeping.
Wipe down Tables and Chairs: Clear tables and chairs and wipe/scrub down with clean wet rags.
Sweep/Mop: Move furniture and sweep and mop the space. This should come after wiping down the tables.
Entryway sweeping: Sweep out stairway and collect any accumulated trash. Also sweep elevator carriage.
Tool collection and reset: Phase 1. Carefully walk through each room in the space and collect any misplaced tools. Look though any bins / crates that are holding tools in out of the way locations, where they wouldn't be found. If the location of tools is not known, collect into a crate for later sorting. Phase 2. Look through tool bins / shelves in electronics area, shop, and sewing area and sort any tools that appear to be in the wrong places, or make better places for them.
Sewing area purge: Remove any less useful scraps, and abandoned projects (Tags >2 months old). Add to Dump Run staging pile.
Shop purge: Remove less useful scrap materials, keeping only the better scraps that can fit in the shop scrap areas. Add to dump run staging pile.
Purge books: Books that are not to be part of the Noisebridge Library collection should be staged for Dump Run, or offered for free on Mission street.
Locker Purge: Lockers shall be opened and purged according to previously established protocols
Project Shelf purge: Abandoned projects (Tags >2 months old) will be untagged and moved to hack shelves or Ewaste staging depending on judgement of person preforming purge.
Window Cleaning: Windows to be wiped clean and dryed. To the extent that the person perfuming the task feels safe doing so.
Bathroom Cleaning: Empty trash cans. Wipe down walls. Scrub fixtures. Sweep and Mop Floors.
Turing Paint Job: Scrub off paint splatters on windows/doors. Mask off equipment. Touch up Ceiling art (See Jarrod for details). Mask and paint walls.
Project Shelf and Hack Shelf relocation: After/During Hack and Project shelf purge. Rebuild shelving in new location for project storage and move hack shelf items to current project shelf location.
Supplies required or desired
Need a faucet to hose adapter for filling mop buckets.